Preparing the loading point and access for a machinery transport

Many delays on collection day are not caused by the machine but by what lies in front of it: the vehicle cannot get into the yard, the crane finds no firm ground, the hall door is lower than expected. A few photos and measurements in advance prevent this.

What matters

Access
Articulated trucks need space to enter and turn. Narrow gates, bends or passages determine the vehicle.
Ground
Paving, asphalt or grass? The ground has to carry the vehicle and crane outriggers.
Door and hall
Door height and width and the route from the installation spot to the door are often the narrowest point.
Clear space
Materials, pallets and third-party vehicles should not be in the way on collection day.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. How wide is the entrance, and can an articulated truck turn on site?
  2. What is the ground like at the loading point?
  3. How high and wide is the hall door?
  4. Are there overhead lines or trees that would obstruct a crane?
  5. What times apply for deliveries on site?

What we need from you

  • Photos of entrance, yard and door
  • Door height and width
  • Description of the ground
  • Sketch with loading point

Preparation: You hand the machine over ready for transport – dismantling, later installation and commissioning are done by your team or the manufacturer's service.

What we do for you

What we organise

  • Transport planned around dimensions, weight and route – with the right vehicle and secure load
  • Loading, unloading and crane work organised alongside on request
  • One contact who coordinates dates with you and the people on site

Good to know

A clear path from the hall to the access road saves time on collection day. Photos of gate and yard help us choose the vehicle.

How it works

  1. 01

    Request

    You send route, date and machine details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check photos and measurements, choose a suitable vehicle and clarify crane position and loading point.

  3. 03

    Quote

    You receive a quote with the agreed scope – on request including loading and crane organisation.

  4. 04

    Execution

    Arrival at the agreed loading point, loading as planned, safe exit from the site.

Questions and answers: Preparing the loading point and access

Which photos help with planning access?

Entrance, yard, hall door and loading point – ideally with measurements of door height and width.

What if a crane would have to stand on grass?

Then the ground has to be checked or reinforced beforehand. Crane outriggers need load-bearing ground.

Who clears yard and hall on collection day?

The operator on site. Third-party vehicles, pallets and materials should not block the way.

Request

Request for this topic: Preparing the loading point and access

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Photos of entrance, yard and door
  • Door height and width
  • Description of the ground
  • Sketch with loading point

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date

About the machine

As precise as known – manufacturer and model help but are not required.

Machine dimensions (L × W × H)

Comma or point as decimal separator, e.g. 2.35 m.

Weight
Is the machine ready for transport?

Ready for transport means: dismantled, secured and prepared for loading. We do not carry out dismantling, installation or commissioning.

Loading at collection
Unloading at destination

Photos, the rating plate or drawings help with planning. You can send them after our first reply – no upload is needed here.