Load securing in machinery transport

A machine must be secured on the vehicle so that it does not slide, tip or move when braking, cornering or swerving. How this is achieved depends on design, weight and centre of gravity.

What matters

Recognised rules
Load securing follows recognised engineering rules such as VDI guideline 2700. Depending on their role, loader, driver and vehicle keeper are responsible.
Blocking and lashing
The machine is blocked against loads and tied down or directly lashed – depending on what the design allows.
Lashing points on the machine
Where the machine may be lashed is specified by the manufacturer. Sensitive covers are not lashing points.
Anti-slip
Anti-slip mats considerably reduce the securing force needed.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Does the machine have designated lashing points?
  2. Which areas must not be loaded – covers, guideways, control panel?
  3. Does the machine stand on a base frame or on levelling feet?
  4. Does it travel packed or unpacked?
  5. Are there parts that could move despite transport locks?

What we need from you

  • Photos of the base frame and possible lashing points
  • Weight and centre of gravity
  • Manufacturer's notes on securing
  • Type of packaging

Preparation: You hand the machine over ready for transport – dismantling, later installation and commissioning are done by your team or the manufacturer's service.

What we do for you

What we organise

  • Transport planned around dimensions, weight and route – with the right vehicle and secure load
  • Loading, unloading and crane work organised alongside on request
  • One contact who coordinates dates with you and the people on site

Good to know

A machine travels most safely when its axes and moving parts are fixed beforehand – then our load securing works at its best.

How it works

  1. 01

    Request

    You send route, date and machine details using the form below – anything unknown can stay open.

  2. 02

    Review

    Based on weight, design and lashing points we define how the machine is secured on the vehicle.

  3. 03

    Quote

    You receive a quote with the agreed scope – on request including loading and crane organisation.

  4. 04

    Execution

    Securing according to plan during loading, checks en route, releasing only at destination immediately before unloading.

Questions and answers: Load securing for machinery

Who is responsible for load securing?

Depending on their role: loader, driver and vehicle keeper. We plan securing according to recognised engineering rules such as VDI guideline 2700.

Does load securing replace the machine's transport locks?

No. Axes and moving parts must be fixed beforehand by your dismantling team; load securing holds the machine as a whole.

May the machine's enclosure be used for lashing?

No. Lashing only takes place at suitable points designated by the manufacturer or at the base frame.

Request

Request for this topic: Load securing for machinery

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Photos of the base frame and possible lashing points
  • Weight and centre of gravity
  • Manufacturer's notes on securing
  • Type of packaging

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date

About the machine

As precise as known – manufacturer and model help but are not required.

Machine dimensions (L × W × H)

Comma or point as decimal separator, e.g. 2.35 m.

Weight
Is the machine ready for transport?

Ready for transport means: dismantled, secured and prepared for loading. We do not carry out dismantling, installation or commissioning.

Loading at collection
Unloading at destination

Photos, the rating plate or drawings help with planning. You can send them after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Request machinery transport