Machinery transport for contract manufacturers and machine shops

For contract manufacturers, every machine is capacity. When a new one is bought, an old one sold or one moved, downtime should stay short. We plan the transport to fit your window between dismantling and installation.

What matters

Short downtime
Between removing the old machine and installing the new one there is often only a weekend. The transport has to fit exactly into it.
Swap in the same place
Old machine out, new machine in: if both move on one day, a joint plan for loading equipment and crane pays off.
Tight halls
Businesses that have grown over time often have angled halls. The way from the installation spot to the door is part of the plan.
Many CNC types
Milling, turning, grinding – each type of machine brings its own transport points.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Is it a new, a sold or a relocated machine?
  2. What window do you have between dismantling and installation?
  3. Will an old machine be collected and a new one delivered on the same day?
  4. What is the route from the installation spot to the hall door?
  5. Who dismantles and installs – the manufacturer or your own staff?

What we need from you

  • Machine type, dimensions and weight
  • Preferred time window
  • Photos of hall and door
  • Contact in the company

Preparation: You hand the machine over ready for transport – dismantling, later installation and commissioning are done by your team or the manufacturer's service.

What we do for you

What we organise

  • Transport planned around dimensions, weight and route – with the right vehicle and secure load
  • Loading, unloading and crane work organised alongside on request
  • One contact who coordinates dates with you and the people on site

Good to know

We plan delivery so that the new machine is at the set-down point in time and your manufacturer can start aligning straight away.

How it works

  1. 01

    Request

    You send route, date and machine details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check the time window, the route through the hall and the loading equipment and align collection and delivery.

  3. 03

    Quote

    You receive a quote with the agreed scope – on request including loading and crane organisation.

  4. 04

    Execution

    Transport within the agreed window, on request with loading and unloading using organised equipment.

Questions and answers: Contract manufacturers and machine shops

Can a machine swap happen in one day?

If dismantling, transport and delivery are well coordinated, yes. We plan collection of the old and delivery of the new machine in the same window, provided loading equipment and dates fit.

What about tight, angled halls?

Photos and measurements of the route from the installation spot to the door help. They show which loading equipment fits and whether additional lifting gear is needed.

Who levels the new machine after transport?

The manufacturer or your service. We make sure it stands at the agreed set-down point in time.

Request

Request for this topic: Contract manufacturers and machine shops

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Machine type, dimensions and weight
  • Preferred time window
  • Photos of hall and door
  • Contact in the company

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date

About the machine

As precise as known – manufacturer and model help but are not required.

Machine dimensions (L × W × H)

Comma or point as decimal separator, e.g. 2.35 m.

Weight
Is the machine ready for transport?

Ready for transport means: dismantled, secured and prepared for loading. We do not carry out dismantling, installation or commissioning.

Loading at collection
Unloading at destination

Photos, the rating plate or drawings help with planning. You can send them after our first reply – no upload is needed here.