LogisticooMachinery

Machines

Transporting folding machines

Folding machines are long and comparatively narrow. Upper beam and folding beam must be fixed, gauges and control panel secured or removed. What matters most is a load bed that safely supports the full length.

What matters

Length
The working length determines the transport length. Long machines need continuous support without sagging.
Fixing the beams
Upper beam and folding beam are moved to transport position and mechanically secured.
Gauge system
Back gauge and supports protrude far and are usually removed.
Control panel
Swivelling control panels are folded in or packed separately.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. What working length and weight does the machine have?
  2. Are upper and folding beams secured?
  3. Will gauges and supports be removed?
  4. Where are the lifting or forklift points?
  5. Does the control panel travel on the machine or separately?

What we need from you

  • Manufacturer, type and weight
  • Transport length, width and height
  • Removed parts
  • Loading situation at both sites

Preparation: You hand the machine over ready for transport – dismantling, later installation and commissioning are done by your team or the manufacturer's service.

What we do for you

What we organise

  • Transport planned around dimensions, weight and route – with the right vehicle and secure load
  • Loading, unloading and crane work organised alongside on request
  • One contact who coordinates dates with you and the people on site

Good to know

Remove the stops and fix the beams – then the machine is ready for safe loading.

How it works

  1. 01

    Request

    You send route, date and machine details using the form below – anything unknown can stay open.

  2. 02

    Review

    We check the length against the load bed, the support points and the securing of the beams.

  3. 03

    Quote

    You receive a quote with the agreed scope – on request including loading and crane organisation.

  4. 04

    Execution

    Loading with continuous support, securing, transport and handover at destination.

Questions and answers: Folding machines

Why does a folding machine need continuous support?

It is long and comparatively narrow. Without continuous support it could sag or be overloaded at a few points.

Are gauges and supports removed?

Usually yes, because they protrude far. They travel as separate parts and belong in the parts list.

Who fixes the upper and folding beams?

Your service team before collection: the beams are moved to transport position and mechanically secured.

Request

Request for this topic: Folding machines

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Manufacturer, type and weight
  • Transport length, width and height
  • Removed parts
  • Loading situation at both sites

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and date

Collection
Destination

We check every route and come back with a proposal.

Date

About the machine

As precise as known – manufacturer and model help but are not required.

Machine dimensions (L × W × H)

Comma or point as decimal separator, e.g. 2.35 m.

Weight
Is the machine ready for transport?

Ready for transport means: dismantled, secured and prepared for loading. We do not carry out dismantling, installation or commissioning.

Loading at collection
Unloading at destination

Photos, the rating plate or drawings help with planning. You can send them after our first reply – no upload is needed here.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Request machinery transport